Hi,
Im new to SAP, managing basic BASIS tasks.
We have a landscape with DEV QA, PRD with client 100 in each one of them (apart from the 000,001,066 clients)
the transport are working as usual DEV > QA > PRD
i want to make a seperate testing system which would be based on actual company master data and transactions but we need full options enabled to play around with, what are the best safe options ?
should i make a seperate server , or should i make a seperate client like client 200 in QA ?
i just want this to be seperate from the existing transport system & we dont want any cross client issues if anything is changed in the sandbox client/system.
our environment is AIX 6.1 with DB2 9.7. SAP runing on Nw 7.0.2 and ECC 6 EHP5
regards
Zaid Umer